GE Industrial Solutions A-Series II Panelboards TEY User Manual
A-series, Ii panelboards
DEH40155
DEH40155 Rev.No.02
1
g
A-Series
®
II Panelboards
AD/AE/AQ Type P & N Power Panel
TEY Three-Phase Circuit Breaker Kits
Introduction
These instructions describe the installation of TEY three-phase circuit breaker kit into an
A-Series
®
II panelboard. These kits are for use in panelboards ordered with Un-Specified
Space. This kit requires minimum of X2, 12 inches of unspecified space.
The catalog number for twelve-pole TEY breaker kit is ASPP6EY12D
Parts List ASPP6EY12D
Table 1.
ITEM #
DESCRIPTION
PART #
QTY
1
A & C PHASE 200A STRAP
315A7049P10
4
2
STRAP, CENTER
315A7048P20
2
3 3X
BRANCH
BASE
911E347P3
2
4
THREAD ROLLING SCREW & WASHER 315A7034P6
6
5
FILLER PLATE, TEY
139C5503P129
1
6
SCREWS , #10-32 X 3/8
N722P16006B6
4
Installation
WARNING: Before attempting to install one of these kits, remove all power from the
panelboard.
Use the following procedure to install a TEY circuit breaker kit. Call-out numbers in the
illustrations and numbers in brackets in the text refer to the Item Numbers in Table 1.
Installation of a three-pole kit is illustrated in Figure 1.
1. Remove the interior assembly from its packaging and verify that all parts are
present, as given in the parts list.
2. Remove the 8 screws (600A and 800A panels) securing the dead front to
panelboard interior. Lift off the dead front and place it and the screws aside.
3. Remove the circuit breaker kit from its packaging and verify that all parts are
present, as given in the packing list.
4. Refer fig no.1 to mount the breaker on interior. Place 3X base[3]adjacent to the
crossbar[7] to locate the mounting hole for the B phase strap [2]. Remove 3X base
[3] and screw the B phase Strap [2] into place using screw [4]. Then mount the
straps for A and C phase [1] into place using screws [4]. Similarly mount the
second 3X base straps and screws. All phase straps should be clamped with main
bus using screws [4] with a maximum of 60 in-lb torque.