Step 6 – check breaker functions – GE Industrial Solutions Record Plus Shunt Trip and Undervoltage Release User Manual
Page 4

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency
that may be met in connection with installation, operation, or maintenance. Should further information be desired or
should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be
referred to the GE Company. The circuit breaker is a sealed unit that contains no user-serviceable parts. Tampering
with the seal will void the warranty.
g
GE Industrial Systems
General Electric Company
41 Woodford Ave., Plainville, CT 06062
www.geindustrial.com
DEH40363 R03 0808
© 2003 General Electric Company
Step 6 – Check Breaker
Functions
Perform operational checks to insure proper
functioning of the new accessory.
• For a shunt trip, apply the rated voltage and verify
that the breaker trips.
• For an undervoltage release, apply the rated
voltage to allow the breaker to close, then remove
the voltage and verify that the breaker trips.
See NEMA publication AB4 for further details.
WARNING
: It is important that the cover is installed
correctly to ensure proper circuit breaker operation.
AVERTISSEMENT: Il es important de verifier que
tout cuvercle ou cache de protection est
correctement installe afin d’assurer le bon
fonctionnement de l’appareil.