Step 4 – Check Operation
1.
To check the RESET operation, rotate the
mechanism handle counterclockwise toward
the RESET position until the breaker resets.
2.
To check the ON–OFF operation of the
breaker, depress the interlock release and
rotate the handle between the ON and OFF
positions.
3.
With the rotary handle and the circuit breaker
in the ON position, press the trip button to
verify that the rotary handle indicates TRIP.
Figure 8 handle operator installed on
vertically mounted breaker
Figure 9. Swing of the handle extension
180
0
Figure 10. Handle operator installed on
horizontally mounted breaker
FENRD
These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency
that may be met in connection with installation, operation, or maintenance. Should further information be desired or
should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred
to the GE Company. The circuit breaker is a sealed unit that contains no user-serviceable parts. Tampering with the seal will
void the warranty.