beautypg.com

2 ring door installation, 2 ring door installation instructions, Installation – Grain Systems Tanks PNEG-1093 User Manual

Page 51

background image

6. Installation

PNEG-1093 2.66" Corrugation Unstiffened Bin

51

2 Ring Door Installation

Before starting to install, be sure the correct door has been received.

(See Chart on Page 51.)

Note that

one ring doors are standard with some sizes of bins/silos. Refer to

Page 57

for round access door

installation instructions.

2 Ring Door Installation Instructions

(See Figure 6V on Page 52.)

1. Remove inner door panels (19-21) and outer door cover (1). Apply double row of rope caulk along

door flanges, noting how door and bin sheets lap. The top of the door frame goes to the inside of
the sidewall and the bottom of the door frame goes to the outside of the sidewall sheet. With inner
door panels and outer door cover removed, set door frame into opening. Insert a bolt at the four (4)
corners of door frame and sidewall, but do not tighten until completing

Step #2

.

2. Re-install inner door panels (19-21) at original locations. Close latch bars (12) to lock panels in place.

Be sure that panels are fully seated over all bearing pins (17). Install inner panel hinge assemblies
per illustration instructions with hinges.

NOTE: Do not distort door frame with use of alignment or drift punches - if necessary, drill or ream

holes to insert bolts in door frame. Now tighten frame bolts starting at center and working
toward top and bottom on each side.

3. Keep inner panels latched and loosen all bearing pin bolts (17). Re-tighten all bearing pin bolts. This

makes loading on pins uniform for easier operation of panels.

4. If some latch bars (12) are loose or require excessive force to lock, loosen hex socket cap screws

and adjust in or out until latch bars operate smoothly. Check that the panels are fully seated over all
bearing pins.

5. Re-install outer door cover (1). Adjust outer door hinges and latches as required.

6. Assemble door hold back as shown in

Figure 6V on Page 52

. Open door cover (1) until it approaches

the bin wall. Hook retaining bracket (5) over lower latch (2) mount and position the door hold back
bracket (24) against bin wall in a valley. Drill a 3/8" hole through the bin wall and bolt the door hold
back bracket (24) to the bin. If needed, install the door hold back extension (25) to door hold back
bracket (24).

Figure 6U 2 Ring Door Installed

2.66" Corrugation 2 Ring Door Assemblies

WD-6130

12'-27' Diameter Bins

WD-6225

WD-6131

30'-48' Diameter Bins (Up to 12 Rings)
54'-60' Diameter Bins (Up to 8 Rings)

WD-6226

WD-6159

30'-48' Diameter Bins
(13 Rings and Taller)

WD-6229

WD-1 Ring Door
Weldment

54'-60' Diameter Bins
(9 Rings and Taller)

Optional 2.66" Corrugation 2 Ring Door Assemblies

WD-6132

12'-24' Diameter Bins
with Auger Hood Panel

WD-6227

WD-6158

12'-27' Diameter Bins
Braced Door Frame

WD-6228