Eave safety cage – Grain Systems Tanks PNEG-1093 User Manual
Page 47
6. Installation
PNEG-1093 2.66" Corrugation Unstiffened Bin
47
Eave Safety Cage
Before attaching any pieces to the ladder or platform, some pre-assembly will be required. Attach
two (2) safety cage brackets to the extension rails and one safety cage bracket to the 2
nd
4' ladder section
as shown
. Take the safety cage hoop adjuster plates and bolt them onto the extension angle
as shown. Using the proper configuration depending on the diameter of the bin, bolt the safety cage hoop
adapters together and attach to the safety cage hoop halves. Bolt the safety cage hoop adapters and
safety cage hoop halves together using the proper holes depending on the diameter of the grain bin.
Be sure to use the 5/16" x 3/4" bolt with the head of the bolt to the inside of the safety cage. You may now
bolt these assemblies to the safety cage brackets and hoop adjuster plates, tighten bolts as you go. The
bottom assembly requires two (2) hoop halves and will be positioned just below the platform as shown.
Use the safety cage hoop adapter angle to secure the two (2) hoop half assembly to the vertical entrance
angle on the platform assembly.
Figure 6O