beautypg.com

Grain Systems Bin Accessories PNEG-1096 User Manual

Page 45

background image

45

PNEG-1096 Ladder, Safety Cage, & Platforms

4.00 INSIDE STIFFENED

Inside Ladder

INSIDE OF GRAIN BIN

INSIDE LADDER PLACEMENT

The inside ladder package includes the lad-
ders and double the amount of standoffs.
Begin by positioning the ladder directly un-
der the manhole roof panel and place the
standoffs every 22" vertically on the sidewall
sheets using the horizontal seam holes for
every other hole location. Us 5/16" x 3/4" bin
bolts to attach the standoffs to the sidewall
of the grain bin. Refer to the diagram on the
right.

LS-121 LADDER

STANDOFFS

22" TYP.

18.3/4"

REV. 5-25-95

INSIDE LADDER STANDOFFS REQUIREMENTS

Field drilling will be necessary for the standoffs located in
the middle of the sidewall sheet. Drill 2 holes 3/8" diameter
directly in line with the horizontal seam holes 18 3/4" apart.
Continue down the sidewall with standoffs at every 22"
spacing. Refer to the diagrams at the left.

Manway Sheet