Grain Systems Bin Accessories PNEG-1451 User Manual
Page 54
6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings
54
PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks
Intermediate Starter Bracket and Ladder Assembly with
Safety Cage
After drilling the two (2) 3/8" holes, attach the starter brackets to the sidewall as shown in
. Check
the top ladder section to make sure the ladder rung dimples are to the top surface and attach to the starter
brackets using the holes located 1" from the top of the ladder. See general detail information
for proper installation of additional ladder sections required. Standoff brackets must be installed on the
ladder sections and attached to the sidewall at each horizontal seam (repeating every 32") until reaching
the base platform. (Use 5/16" x 3/4" bin bolts for all connections.) In addition to the two (2) field drilled holes
in the sidewall for the starter bracket, it is also be necessary to field drill a 3/8" hole in the ladder section
for the starter bracket. Refer to the section in these instructions that references the location of the
base platforms.
Figure 6U