Intermediate platform mounting angle installation – Grain Systems Bin Accessories PNEG-1451 User Manual
Page 52
6. 2.66" Corrugated Commercial Hopper Tank 10-22 Rings
52
PNEG-1451 Ladder, Safety Cage and Platform for Hopper Tanks
Intermediate Platform Mounting Angle Installation
For bins with 18-22 rings, an intermediate platform is required.
shows the location of the
intermediate platform mounting angles. Each angle must be mounted starting 4" below the top horizontal
seam of the ring specified in the
, with the first mounting angle directly in line with the left
hand eave mounting angle. The second mounting angle must be located 56-1/4" to the left of the first
mounting angle. Pay careful attention when installing these angles. The dimensions and locations of these
angles are critical to assure proper fit of all parts. Using the platform mounting angels as guides, field drill
3/8" holes in the sidewall every 8".
Figure 6S
for distance
between platform
mounting angles
(Section A) and ring
location (Section C).
Eave platform mounting
angles shown for reference
only. (
installation details.)