Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) PowerPack & Stinger w_EconoMind '06-07 For use with PowerPDA User Manual
Page 27

96813 v.9.0
27
Installation not needed if optional
Banks PowerPDA is installed.
Caution: Do not use force
when working on plastic parts.
Permanent damage to the part
might result.
Two holes must be drilled into the
instrument cluster bezel that will
require the removal of the instrument
cluster bezel, cup holder / storage
tray, vertical panel and instrument
panel center bezel. Alternatively,
two holes can be drilled with the
instrument cluster still in place if a
right angle drill and 1⁄8 Uni-drill bit is
used.
• Step 1 thru 9 to install the power
level selector switch on the
instrument cluster bezel without a
right angle drill.
• Step 10 thru 14 to install the
power level selector switch on the
instrument cluster bezel using a
right angle drill.
• Step 15 thru 18 to install the
power level selector switch in the
accessory switch cutout.
Note: Some vehicles are equipped
with an electric pedal adjustment
switch. If your vehicle is equipped
with this switch then do not install
the Banks power level selector
switch in this location.
• Step 19 thru 21 to install power
level selector switch in location of
your choice.
Drilling Instrument Cluster Bezel
without a right angle dill Step 1
thru 9.
1.
Remove the screws and unclip the
knee dash panel located under the
steering wheel and set aside.
2.
Remove the cup holder / storage
tray. The screws are located under
the rubber inserts. Remove the
rubber inserts then remove the
screws and set the cup holder /
storage tray aside. See Figure 34.
3.
Remove the screws to the
remainder of the cup holder / storage
tray and set aside.
NOTE: The cup holder / storage tray
is a two-piece item.
4.
Remove the screws to the vertical
panel directly beneath the instrument
panel center bezel then remove the
vertical panel and set aside.
5.
Remove the instrument panel
center bezel screw.
Figure 34
Section 7
PoWER SELECToR SWITCH INSTALLATIoN
Figure 33