beautypg.com

Rough Country 7503 User Manual

Page 6

background image

POST INSTALLATION INSTRUCTIONS

1. Lug nuts should be check after 50 miles and all nuts and bolts should be checked and tightened after 500 miles. All

parts should be checked every 3000 miles for the life of the vehicle.

2. Recheck brake hoses and lines for proper clearances.
3. Perform steering sweep to check for appropriate tire clearance. Note- Some oversized tires may require trimming of

the bumper and valance

4. If new tires are installed that are more than 10% taller than original tires, the speedometer must be recalibrated for

the anti-lock brake system (if applicable) to function properly. Contact an authorized Ford dealer for details on recali-
bration.

5. Adjust headlights back to proper settings

.

6. Have a qualified alignment center realign front end to factory specs.
7. Install “Warning to Driver” decal on sun visor.

Thank you for purchasing a Rough Country Suspension System.

13MM Wrench

21MM Deep Well Socket

1/2” Ratchet

Hammer

Flat Punch

Pliers

Bearing Grease

1” Socket

Floor Jack

2 Jack Stands

Tools Required

Kit Includes:
Drivers and Passengers Spindles
2-Spindle cotter keys
4-Ball Joint cotter keys
2-Tie Rod Cotter Keys
4-Zip Ties

Part # 528H shown in picture with rear blocks/ u-bolts and shock absorbers.