Installing the th link, Th link, On top-hat rail 4 stop lever – VEGA TH LINK Version 1.1 Installation Guide User Manual
Page 14

Installing the TH LINK
Trebing & Himstedt Prozeßautomation GmbH & Co. KG | TH LINK
14
Installing the TH LINK
Installing the TH LINK
Fig. 2: Installing and removing of the TH LINK
Place the notch of the TH LINK on the top-hat rail and move the
TH LINK downward until the stop lever locks into place on the
top-hat rail.
Warning!
Above and below the TH LINK, a minimum of 2
inches head space for heat dissipation needs to
be available.
1 Device with notch on top-hat rail
2 Top-hat rail
3
TH LINK
on top-hat rail
4 Stop lever
TH LINK
Trebing & Himstedt Prozeßautomation GmbH & Co. KG
www.t-h.de
Made in Germany
Part No.:
10003006
HW-Release: 2.0
Serial No.:
000000
Temperature:
0 to +50 °C
Current: 190
mA
max.
Power Supply: 19.2 to 28.8 V DC
ETH: Ethernet
(green/red)
RUN:
OK (green) | Error (red)
BUS: PROFIBUS
(green/red)
24 V DC
+ –
TH LINK
Tre
bing & H
imsted
t Proz
eßau
toma
tion G
mbH
& C
o. K
G
ww
w.t-
h.de
Made
in G
ermany
Part No.:
10003006
HW-Release: 2.0
Serial No.:
000000
Temperature:
0 to +50 °C
Current:
190 mA max.
Powe
r Supply:
19.2 to 28.8 V DC
ETH: Ethernet
(green/red)
RUN:
OK (green) | Error (red)
BUS: PROFIBUS
(green/red)
24 V DC
+
–
[1]
[3]
[2]
[4]