beautypg.com

Mounting the inverter, Overview, Warning: fire, shock and energy hazards – Xantrex Technology GT3.0 User Manual

Page 43

background image

Mounting the Inverter

975-0131-01-01

2–15

Mounting the Inverter

Overview

General installation
steps

There are four main steps in the installation of the GT Inverter:

1.

Mounting the GT Inverter and installing accessories (this chapter)

2.

Making the DC connections from the PV array to the GT Inverter
(“Connecting the DC Wiring” on page 3–4)

3.

Making the AC connections from the GT Inverter to the main utility service
panel (“Connecting the AC Wiring” on page 3–7)

4.

Grounding the PV array (see your PV equipment documentation).

Figure 2-6 summarizes these four steps.

WARNING: Fire, Shock and Energy Hazards

Before installing the GT Inverter, read all instructions and cautionary markings located in
this manual, on the PV array, and on the main service panel.

Figure 2-6 Installation Overview

Utility Grid

PV Panels

Xantrex GT Inverter

Main Utility

Service Panel

Utility
Meter

600 Vdc

Open

Circuit

Maximum

Primary Earth/

Ground

Gr id Tie Inv erter

1

2

3

4