Xantrex Technology GT3.0 User Manual
Page 107
Index
975-0131-01-01
IX–3
do not illuminate
6–8
red LED is on
6–8
T
temperature
affecting PV array performance
6–2
range for locating Xantrex GT Inverter
2–4
terminal blocks in wiring box
3–3
terminators, male network
3–13
thermal derating chart
A–3
torque values for wires
3–5
troubleshooting the GT Inverter
6–8
V
voltmeter
measuring PV array DC at startup
4–2
measuring utility AC at startup
4–2
W
warranty
out of warranty service
WA–3
terms and conditions
WA–1
weight
A–5
wire stripping length, recommended
2–13
wiring
AC connection planning
2–12
acceptable wire sizes
A–5
conduit planning
2–12
DC connection planning
2–12
information
2–13
knockouts for
2–12
main utility service panel to Xantrex GT Inverter
3–8
preparation for
2–13
PV array to Xantrex GT Inverter
3–5
routing wires
2–11
torquing
3–5, 3–10
wire sizes
2–13
wiring box
description
1–6
removing the cover
3–2
removing the inverter from
6–6
RJ45 connectors
3–3
terminal block location
3–3
X
Xanbus technology
3–12
Xantrex web site
v