beautypg.com

Toshiba RAV-SM560BT-E User Manual

Page 148

background image

148

No.

‚

Part name

Electric parts
box assembly

Procedure

6) Take off fixing screw (1 position) of the electric

parts base, and then pull out the electric parts
base toward you.

7) Pull out Tc sensor and Tcj sensor from sensor

holder of the heat exchanger. After replacement
of the parts, incorporate two sensors without
mistake as shown in the right figure.
(Tube is attached to Tcj sensor.)

8) After replacement of the parts, set a trap so that

water does not enter in the electric parts assem-
bly. (Incomplete process for lead wires may
cause water leak.)

Remarks

Tjc sensor position
(Tube is attached to Tcj sensor.)

TC sensor
position

Fixing screw

Pipe
holder

FFFixing
screw

Fixing
screw

Fixing
screw

1) Remove shaft of the side grille from the air

conditioner body. (First remove the left shaft and
then other shafts while sliding the side grille left
and right.)

1) Perform work of item

‚

.

2) Remove pipe holder at rear side of the main

body.

3) Take off fixing screws (2 pcs.) at the left side of

the end plate of the heat exchanger.

4) Take off two fixing screws of the heat exchanger

holder (right), and then remove the heat ex-
changer holder (right).

5) Take off fixing screw at lower right side of the

heat exchanger.

6) Remove the heat exchanger from the rear main

body by lifting it upward.

ƒ

„

Side grille

Heat exchanger

This manual is related to the following products: