2.1 Unpacking
Before Unpacking
Inspect the equipment container before unpacking. Note and report
evidence of damage immediately.
Unpacking
Procedure
•
Place the container on a clean flat surface. Cut all straps and open or
remove top.
•
Remove the unit carefully and place it securely on a clean surface.
•
Remove all packing material.
•
Inspect the unit for damage. Report any damage immediately.
2.2 Site Requirements
Power
AMC-101 is powered by 100 to 240 VAC or -48 VDC.
The unit should be installed within 1.5m (5 ft) of an easily accessible
grounded AC outlet capable of supplying 230 V (115 V).
Front and Rear
Panel Clearance
Allow at least 90 cm (36 in) of clearance at the front of the unit for operator
access. Allow at least 10 cm (4 in) clearance at the rear of the unit for power
cord connection.
Ambient
Requirements
The ambient operating temperature of AMC-101 should be 0-40
o
C
(32-122
o
F) at a relative humidity of up to 90%, non-condensing.