Roberts Gorden Low Intensity Unitary Heater Designed for Harsh Environments HE-40 User Manual
Vantage, Installation, operation & service manual, Warning
This manual is related to the following products:
Table of contents
Document Outline
- Vantage® HE
- TABLE OF CONTENTS
- SECTION 1: Heater Safety
- SECTION 2: Installer Responsibility
- SECTION 3: Clearances to Combustibles
- 3.1 Required Clearances to Combustibles
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- Note: 1. All dimensions are from the surfaces of all tubes, couplings and elbows. 2. Clearances B, C and D can be reduced by 50% after 25' (7.5 m) of tubing downstream from where the burner and burner tube connect.
- SECTION 4: National Standards and Applicable Codes
- SECTION 5: Major Components
- Figure 13: Major Component Descriptions
- 5.1 Standard Parts List
- Part No.
- Description
- HE-40
- HE-60
- HE-80
- HE-100
- HE-125
- HE-150
- HE-175
- 032XXXXX
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 02568200
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 132100NA
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 94273914
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 96411600
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 91221100
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 91317300
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- *91412204
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 03051503
- 1
- 1
- 1
- 1
- -
- -
- -
- 03051504
- 2
- 4
- 4
- 2
- -
- -
- -
- 03051505
- 1
- -
- -
- -
- -
- -
- -
- Core Packages
- Extension Packages
- Aluminized with
- Aluminum
- Reflector
- Aluminized with
- Stainless Steel
- Reflector
- Aluminized with
- Aluminum
- Reflector
- Aluminized with
- Stainless Steel
- Reflector
- Part No.
- Description
- 10'
- (3 m)
- 20'
- (6 m)
- 30'
- (9 m)
- 40'
- (12 m)
- 10'
- (3 m)
- 20'
- (6 m)
- 30'
- (9 m)
- 40'
- (12 m)
- 10'
- (3 m)
- 20'
- (6 m)
- 30'
- (9 m)
- 40'
- (1 2m)
- 10'
- (3 m)
- 20'
- (6 m)
- 30'
- (9 m)
- 40'
- (12 m)
- 91409408
- -
- 1
- 2
- 3
- -
- 1
- 2
- 3
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 03051101
- -
- -
- 1
- 1
- -
- -
- 1
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- 03051601
- 1
- 1
- -
- -
- 1
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 01312700
- -
- 1
- 2
- 3
- -
- 1
- 2
- 3
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 02750303
- 2
- 3
- 4
- 6
- -
- -
- -
- -
- 2
- 3
- 4
- 6
- -
- -
- -
- -
- 027503SS*
- -
- -
- -
- -
- 2
- 3
- 4
- 6
- -
- -
- -
- -
- 2
- 3
- 4
- 6
- 02750800
- 2
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 027508SH*
- -
- -
- -
- -
- 2
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- 03090100
- 2
- 3
- 4
- 5
- 2
- 3
- 4
- 5
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 91907302
- 2
- 3
- 4
- 5
- 2
- 3
- 4
- 5
- 1
- 2
- 3
- 4
- 1
- 2
- 3
- 4
- 03050010
- 1
- 2
- 3
- 5
- 2
- 4
- 5
- 7
- 2
- 3
- 4
- 6
- 2
- 3
- 4
- 6
- 91107720
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 90502700
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- -
- -
- -
- -
- -
- -
- -
- -
- 01318901
- 1
- 1
- 1
- 1
- 2
- 2
- 2
- 2
- -
- -
- -
- -
- -
- -
- -
- -
- Part Number
- Part No.
- Description
- Quantity
- 90502300
- 2
- 90502700
- 1
- Additional tubing length may be added to heater. Tubing must be heat-treated, aluminized or porcelain coated. Any additional tubing lengths are considered as vent length for length determination. Maximum venting length for minimum heater length is 45...
- Figure 13: Major Component Descriptions
- SECTION 6: Heater Installation
- Figure 14: Critical Hanger Placement (Indoor Installation)
- Figure 15: Critical Hanger Placement (Outdoor Installation)
- Figure 16: Linear Heater Assembly Overview
- Figure 17: Linear Heater Layout Overview
- Step 6.2 Burner Tube Installation
- Step 6.3 Tube Clamp Package Installation
- Step 6.4 Coupling and Tube Assembly
- Step 6.5 Turbulator Installation
- Step 6.6 Reflector Installation
- Step 6.7 Burner Installation
- SECTION 7: Optional Heater Accessories
- 7.1 U-Tube Configuration
- Figure 18: U-Tube Heater Assembly Overview
- Figure 19: U-Tube heater Layout Overview
- 7.2 Elbow Package Configuration
- Step 7.2.1 Elbow Installation
- Step 7.2.2 Elbow Installation
- Step 7.2.3 Reflector Joint Installation
- Step 7.2.4 Reflector Joint Installation
- Step 7.2.5 Reflector Joint Detail
- Figure 20: Reflector Joint Detail
- 7.3 Reflector Side Extension (Not For Outdoor Use)
- Step 7.3.1 Bracket Installation
- Step 7.3.2 Side Reflector Installation
- 7.4 Lower Clearance Shield Installation (Not For Outdoor Use)
- Step 7.4.1 Shield Support Strap Assembly
- 7.5 Two-Foot Decorative Grille Installation (Not For Outdoor Use)
- Step 7.5.1 Grille Installation
- Step 7.5.2 Frame Shield Installation
- Step 7.5.3 Reflector Side Extension Installation for Decorative Grilles
- Step 7.6.1 Silicone Cap Installation
- Step 7.6.2 Grille End Cap Installation
- Step 7.6.3 Grille Installation
- SECTION 8: Venting
- 8.1 General Venting Requirements
- 8.1.1 United States Requirements
- 8.1.2 Canadian Requirements
- Figure 22: Tube Termination
- 8.7 Venting Options
- 8.8 Horizontal Ventilation 4" (10 cm) Pipe
- 8.9 Vertical Ventilation 4" (10 cm) Pipe
- 8.10 Common Sidewall Venting
- 8.11 Common Vertical Venting
- 8.12.1 Length Requirements
- 8.12.2 Vertical Outside Air Supply for Single Heater Installation
- 8.12.3 Horizontal Outside Air Supply for Single Heater Installation
- 8.12.4 Vertical Outside Air Supply for Double Heater Installation
- 8.12.5 Horizontal Outside Air Supply for Double Heater Installation
- SECTION 9: Gas Piping
- SECTION 10: Wiring
- SECTION 11: Operation and Maintenance
- 11.1 Sequence of Operation
- 1. Turn the thermostat up. When the thermostat calls for heat, the SmartValve® II will energize. After a short period, power is supplied to the blower motor.
- 2. When the motor approaches nominal running RPM, the pressure switch closes and signals the ignition module/SmartValve® II.
- 3. The ignition module/SmartValve® II then energizes the hot-surface igniter for a timed warm-up period (approximately 45 to 60 seconds). After the warm-up period, the gas valve is energized.
- 4. If a flame is detected, the gas valve remains open and the igniter is de-energized. When the call for heat is satisfied, and the system control mechanism de-energizes the burner line voltage supply, the gas is turned off.
- 5. If no flame is detected by the flame sensing rod, the igniter is de-energized and the module/ SmartValve® II will close and a purge period begins. After the purge, the module/SmartValve® II acts to power the igniter for a second warm-up period a...
- 6. If the flame extinguishes during operation, the igniter module will provide multiple trial sequences described in step 5. If ignition is not re-established, the module/SmartValve® II will lockout for one hour or until reset.
- 7. After lockout, reset by turning down thermostat for five seconds, and then raising it again to desired temperature, or by disconnecting power and then reconnecting.
- 11.2 To Shut Off Heater
- 11.3 To Start Heater
- 11.4 Pre-Season Maintenance and Annual Inspection
- 11.5 Maintenance Checklist
- 11.1 Sequence of Operation
- SECTION 12: Troubleshooting
- SECTION 13: Replacement Parts
- SECTION 14: General Specifications
- SECTION 15: The ROBERTS GORDON® VANTAGE® HE Warranty