Nortel Networks Nortel Secure Router 4134 User Manual
Page 18
18
Commissioning configuration procedures
2
Verify that diagnostic testing is underway by observing the startup
messages on your local terminal.
3
Once the router completes the self-diagnostics tests, verify that the
System LED and the power LEDs that correspond to the power
supplies installed on your router (PS0 and PS1) are green.
4
Verify that the fan LED on the rear panel of the Secure Router 4134
is green, and air is flowing through the unit.
—End—
For troubleshooting information, see Nortel Secure Router 4134 —
Troubleshooting (NN47263-700).
When the Secure Router 4134 begins powering up, the boot sequence
displays messages on the terminal or PC that you connected to the console
port. A prompt displays at the beginning of the boot sequence indicating
that you can stop the auto-boot sequence by pressing any key. The Secure
Router 4134 waits for 5 seconds for input from you before beginning the
boot sequence. If you press a key and stop the auto-boot sequence, the
Secure Router 4134 displays the bootrom command menu. The following
figure shows the prompt to stop the auto-boot sequence and enter the
bootrom command area.
Nortel Secure Router 4134
Commissioning
NN47263-302
01.02
Standard
10.0
2 August 2007
Copyright © 2007, Nortel Networks
.