Table 36: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
“AC Power Specifications for EX8200
Switches” on page 109
“DC Power Specifications for EX8200
Switches” on page 110
“Power Requirements for EX8208
Switch Components” on page 111
Power Requirements for EX8216
Switch Components
“Calculating Power Requirements for
an EX8208 Switch” on page 114
Calculating Power Requirements for
an EX8216 Switch
“Calculating the EX8200 Switch
Fiber-Optic Cable Power Budget” on
page 120
“Calculating the EX8200 Switch
Fiber-Optic Cable Power Margin” on
page 121
Calculate the power consumption and
requirements.
Rack or Cabinet
“Rack Requirements for an EX8208
Switch” on page 97
Rack Requirements for an EX8216
Switch
“Cabinet Requirements and
Specifications for an EX8208 Switch”
on page 100
Cabinet Requirements and
Specifications for an EX8216 Switch
Select the type of rack or cabinet and verify that
it meets the minimum requirements for the
installation of the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for an
EX8208 Switch” on page 101
Clearance Requirements for Airflow
and Hardware Maintenance for an
EX8216 Switch
Plan rack or cabinet location, ensuring the
required space clearances.
Copyright © 2010, Juniper Networks, Inc.
92
Complete Hardware Guide for EX8208 Ethernet Switches