CHAPTER 4
Site Preparation
•
Site Preparation Checklist for an EX8200 Switch on page 91
•
General Site Guidelines for EX Series Switches on page 93
•
Site Electrical Wiring Guidelines for EX Series Switches on page 94
•
Environmental Requirements and Specifications for EX Series Switches on page 95
Site Preparation Checklist for an EX8200 Switch
The checklist in Table 36 on page 91 summarizes the tasks you need to perform to prepare
a site for installing an EX8200 switch.
Table 36: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
“Environmental Requirements and
Specifications for EX Series Switches”
on page 95
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.