beautypg.com

Test 27 - check start-run-stop switch (sw1), Test 28 - check start-run-stop switch (sw1) wiring – Guardian Technologies 5209 User Manual

Page 54

background image

section 6
Diagnostic tests

Page 52

Ground. 12 VDC should be measured. Reconnect Wire 13 to
the SCR. If 12 VDC is NOT measured on Wire 13 Stop Testing
and repair or replace Wire 13 between the Starter Contactor
(SC) and the Starter Contactor Relay (SCR).

Note: Jumper leads may be used if necessary.
4. Set voltmeter to measure resistance.

5. Remove Wire 13, Wire 16, and Wire 17 from the Starter

Contactor Relay (SCR)

6. Connect the meter leads across Terminal 87 and Terminal 30 of

the SCR. See Figure 6-35.

85

87a

30

86

SCR

87

16

15

17

13

00.00

Figure 6-35. – Starter Contactor Relay Test

7. Connect a jumper wire from Terminal 85 to ground. The relay

should energize and the voltmeter should read continuity. See
Figure 6-35.

8. Reconnect all Wires.

RESULTS:
If continuity was not measured in Step 7 replace the

Starter Contactor Relay. If all steps passed refer back

to flow chart.

TEST 27 - CHECk START-RUN-STOP SWITCH

(SW1)

PROCEDURE:
1. Set a voltmeter to measure resistance.

2. Remove all wires from the Start-Run-Stop Switch (SW1).

3. Using the chart below ohm out the Start-Run-Stop Switch.

Connect one meter test lead to one terminal and the other meter
test lead to the other terminal. With meter leads connected acti-
vate the switch to Start, Stop or Run and follow the chart.

4. Reconnect all wires to the switch.

CONDITION

TERMINALS

RESULT

STOP

5,4

OPEN

STOP

5,6

CLOSED

STOP

2,1

OPEN

STOP

2,3

CLOSED

RUN

ALL CONDITIONS

OPEN

START

5,4

CLOSED

START

5,6

OPEN

START

2,1

CLOSED

START

2,3

OPEN

167

STOP

0

15

15

17

4

5

6

1

2

3

RUN

START

0

Figure 6-36. – Start-Run-Stop Switch (SW1)

RESULTS:
If the switch fails any part of the test procedure

replace the switch.

TEST 28 - CHECk START-RUN-STOP SWITCH

(SW1) WIRINg

PROCEDURE:
1. Set voltmeter to measure resistance.

2. Remove Wire 17 from the Starter Contactor Relay (SCR).

Connect one meter test lead to Wire 17. Remove Wire 17 from
the Start-Run-Stop Switch (SW1). Connect the other meter test
lead to wire 17. Continuity should be measured.

3. Remove both Wire 0 from the Start-Run-Stop switch (SW1) it is

located in two positions on the switch. Connect one meter test
lead to one Wire 0 and connect the other meter test lead to the
other Wire 0. Continuity should be measured.

4. Remove Wire 0 from the Start-Run-Stop switch (SW1) it is

located in two positions on the switch. Connect one meter test
lead to one Wire 0 and connect the other meter test lead to
frame ground. Continuity should be measured.

This manual is related to the following products: