beautypg.com

Installation instructions, Commissioning – Stovax PR0919 User Manual

Page 22

background image

22

INSTALLATION INSTRUCTIONS

COMMISSIONING

7. COMMISSIONING

7.1 Complete the Commissioning Checklist at the front of this

manual covering:

• Flue checks

• Gas checks

• Pebble layout - flame picture

For working pressure test, use the access panel at the gas

connection ensuring the burner is in position.

7.2 In the unlikely event that the appliance is receiving

interference from other electronic devices, re-programme

the handset/Control box

Reprogramming handset/Control box

• Remove the battery cover from the handset to see the

four DIP switches. See diagram29

29

AR1935

Each of the four switches can be set to either one of two

positions, in any combination.

To re-code the handset

• Change the combination of how the DIP switches are set.

For example see diagram20

30

AR1936

Once the handset has a new code the control box needs to

be reprogrammed:

To access the control box see Servicing Instructions, Section

7 - Main Control Assembly.

• Press and hold the reset button on the control box until

you hear two signals. After the second longer signal:

Release the reset button and within 20

seconds

Press the DOWN button on the handset until

you hear an additional long signal

confirming the new code