Installation instructions, Installation – Stovax PR0919 User Manual
Page 18
18
INSTALLATION INSTRUCTIONS
INSTALLATION
Studio 1 BF
17
Studio 2 BF
Studio 1 & 2 BF
AR1671, AR1971, AR1673
TAkE CARE WHEN MARkING OUT FOR THE FLUE AS IT
IS DIFFICULT TO MOVE AFTER INSTALLATION. IF A
RESTRICTOR IS REQUIRED FIT THIS BETWEEN THE
SMALL OUTLET SPIGOT AND THE AIR DUCT SEE
DIAGRAM 18. REFER TO TECHNICAL SPECIFICATIONS
FOR RESTRICTOR SIZE.
18
AR0627
4.2 A 152mm (6") diameter hole in the wall is required to install
the flue. This can be achieved by either:
a) Core drill
b) Hammer and chisel
• Drill small holes around the circumference when using
method b. Make good both ends of the hole.
4.3 • Remove the backing paper from the silicone foam strip
supplied in the fixing kit
• Fix to the back of the outer flanges of the appliance
• Ensure it is located below the frame location lugs on the
top flange. Foam strip may need cutting to length.
4.4 When installing the appliance into a combustible
enclosure, ensure all the clearances are observed.
METHOD 1 (FRAME) ONLY
• Secure the appliance through the four fixing holes using
the screws provided. See Diagram 19.
19
AR1914
4.5 • Allow enough room either above or to the side of the
appliance to assemble the flue on top
• Assemble a horizontal flue in the following order:
- Vertical section
- 90° elbow
- Horizontal plus terminal
• Support the opening of a masonry installation with a
lintel