Watts Fleck 9500 Twin Brass Valve User Manual
Page 19

Model 9000/9100/9500
19
Set Control Programming
1.
Press and hold both the Set Up and Set Down buttons for 5 seconds.
2.
Set the Treated Water Capacity. Using the Set Up or Set Down buttons, set the amount of treated water to
flow through the unit before a Regeneration is required.
3.
Press the Extra Regeneration button.
4.
Set the Regeneration Time. Use the Set Up or Set Down buttons to set the desired time of day for
Regeneration to occur.
NOTE: This does not display if Regeneration occurs immediately.
5.
Press the Extra Regeneration button.
6.
Set Regeneration Day Override. Use the Set Up or Set Down buttons to set the maximum number of days
before a Regeneration cycle must occur.
7.
Press the Extra Regeneration button to exit the program.*
NOTE: If setting up the system for the first time, perform the following Fast Cycle Regeneration:
1. Press the Extra Regeneration button for 5 seconds to force an Extra Regeneration immediately.
2. Once the valve reaches Regen Step #1, let water run to drain for approximately 5 minutes.
3. Press the Extra Regeneration button once to advance valve to Regen Step #2.
4. Press the Extra Regeneration button once to advance valve to Regen Step #3 (if active).
5. Press the Extra Regeneration button once to advance valve to Regen Step #4 (if active).
6. Press the Extra Regeneration button once to advance valve to Regen Step #5 (if active).
7. Press the Extra Regeneration button once more to advance the valve back to In Service.