Mount the switch, Rack or cabinet mounting, Mount the switch -11 – HP 6400CL User Manual

Page 29: Rack or cabinet mounting -11

background image

2-11

Installing the Switch

Installation Procedures

In

sta
lli

ng th

e Swi

tch

When the self test completes successfully:

The

Power and Fan Status LEDs remain on.

The

Fault and Test LEDs go off.

The port LEDs (includes the expansion module LEDs) go into their
normal operational mode:

If the ports are connected to active network devices, the LEDs
behave according to their function, Link or Activity.

If the ports are not connected to active network devices, the LEDs
will stay off.

If the LED display is different than what is described above, especially if
the

Fault and Test LEDs stay on for more than 60 seconds or they start

blinking, the self test has not completed correctly. Refer to chapter 4,

“Troubleshooting”

for diagnostic help.

3.

After the self test has completed successfully disconnect the power cord
in preparation for mounting the switch.

5. Mount the Switch

After the switch passes self test, you are ready to mount the switch in a stable
location. The Series 6400cl Switch devices can be mounted in these ways:

in a rack or cabinet

on a horizontal surface

Rack or Cabinet Mounting

The Series 6400cl Switch devices are designed to be mounted in any EIA-
standard 19-inch telco rack or communication equipment cabinet.

W A R N I N G

For safe operation, please read the installation precautions on

page 2-4

, before mounting a switch.

E q u i p m e n t
C a b i n e t
N o t e

The 12-24 screws supplied with the switch are the correct threading for
standard EIA/TIA open 19-inch racks. If you are installing the switch in an
equipment cabinet such as a server cabinet, use the clips and screws that came
with the cabinet in place of the 12-24 screws that are supplied with the switch.

Complete step 1, and plan which four holes you will be using in the cabinet
and install all four clips. Then proceed to step 2.