0 installation, 1 preparation, 2 tower ups installation – Emerson Liebert UPStation GXT2U User Manual
Page 12: Nstallation, Preparation, Tower ups installation, Caution

Installation
8
5.0
I
NSTALLATION
5.1
Preparation
1. Visually inspect the UPS for freight damage. Report damage to
the carrier and your local dealer or Liebert representative.
2. Decide where to place the Liebert UPStation GXT2U. Install the
UPS indoors in a controlled environment, where it cannot be
accidentally turned off. Place it in an area of unrestricted airflow
around the unit, away from water, flammable liquids, gases,
corrosives, and conductive contaminants. Maintain a minimum
clearance of 100mm (4 in.) in the front and rear of the UPS.
Maintain an ambient temperature range of 0°C to 40°C (32°F to
104°F).
3. The Liebert UPStation GXT2U may be installed in either a tower
configuration or in a rack, depending on available space and use
considerations. Determine the type of installation and follow the
appropriate instructions in either 5.2 - Tower UPS Installation
or 5.3 - Rack-Mount UPS Conversion and Installation.
5.2
Tower UPS Installation
When using the Liebert UPStation GXT2U in a tower configuration,
use the included support base (shown below, left) to stabilize the UPS.
If any battery cabinets are added, they will include spacers to accom-
modate the additional cabinets (shown below, right).
!
CAUTION
The UPS is heavy (see 12.0 - Specifications section). Take
proper precautions when lifting or moving it.
NOTE
UPS operation in temperatures above 25°C (77°F) reduces
battery life.
Support base
Spacers added to support
base to accommodate
additional battery cabinets