beautypg.com

Routine maintenance – Ion Science Hydrosteel 6000 User Manual

Page 31

background image

Hydrosteel 6000 MANUAL

Ion Science Ltd

Page 31 of 39

Unrivalled Detection. www.ionscience.com

Routine maintenance

1) Open the regulator. By turning the valve knob as indicated.


















2) Connect the Hydrosteel 6000 analyser to the 2 ft LT-R sample tube then connect the end of the

sample tube to the flood leak as shown .











3) Leave the instrument connected for 1 to 2 minutes for the reading to stabilise.
4) For the LT probe the readings should be between 280 pl/cm

2

/s and 380 pL/cm

2

/s. For the HT probe

the between 2200 pL/cm

2

/s and 3000 pL/cm

2

/s.