Ion Science Hydrosteel 6000 User Manual
Page 18
Hydrosteel 6000 MANUAL
Ion Science Ltd
Page 18 of 39
Unrivalled Detection. www.ionscience.com
Guide to field measurements
Step 7: Completing the task. To download data to computer, remove the analyser from the jacket, activate
‘PC connect’ (TOOL-RECORD keys), align with the IRDA link box, and execute the file ISPLC.EXE. Make
sure test equipment is clean and dry, return to the field case, and store field case in a cool dry location.
WARNING
The HT-R probe and associated equipment includes a heat shield which partially
reduces the temperature of the collector handle. It does NOT enable handling of
the collector without gloves. ALWAYS wear suitable heat resistant gloves when
handling the high temperature collector