beautypg.com

4 option components – Yaskawa SI-EN3 Installation User Manual

Page 13

background image

4 Option Components

YASKAWA ELECTRIC TOBP C730600 58B 1000-Series Option SI-EN3 Installation Manual

13

Power-Up Diagnostics

An LED test is performed each time the drive is powered up. The initial boot sequence may

take several seconds. After the LEDs have completed the diagnostic LED sequence, the

option is successfully initialized. The LEDs then assume operational conditions as shown in

Table 4

.

Table 5 Power-Up Diagnostic LED Sequence

10/100

<1>

Green

OFF

10 Mbps is established

Green

ON

100 Mbps is established

LINK/

ACT

<1>

Green

OFF

Link is not established

Green

ON

Link is established

Green

Flashing

Link is established and there is
network activity

<1> Remove the drive front cover to check the status of the LED. Be careful not to touch the main circuit terminals or

the control board in the drive.

Sequence

Module Status (MS)

Network Status (NS)

Time (ms)

1

Green

OFF

250

2

Red

OFF

250

3

Green

OFF

4

Green

Green

250

5

Green

Red

250

6

Green

OFF

LED

Name

Indication

Operating Status

Remarks

Color

Status

EtherNet_IM_E_conditional.fm 13 ページ 2012年10月31日 水曜日 午後12時53分

This manual is related to the following products: