4 Option Components
YASKAWA ELECTRIC TOBP C730600 58B 1000-Series Option SI-EN3 Installation Manual
13
■
Power-Up Diagnostics
An LED test is performed each time the drive is powered up. The initial boot sequence may
take several seconds. After the LEDs have completed the diagnostic LED sequence, the
option is successfully initialized. The LEDs then assume operational conditions as shown in
.
Table 5 Power-Up Diagnostic LED Sequence
10/100
Green
OFF
10 Mbps is established
–
Green
ON
100 Mbps is established
LINK/
ACT
Green
OFF
Link is not established
Green
ON
Link is established
Green
Flashing
Link is established and there is
network activity
<1> Remove the drive front cover to check the status of the LED. Be careful not to touch the main circuit terminals or
the control board in the drive.
Sequence
Module Status (MS)
Network Status (NS)
Time (ms)
1
Green
OFF
250
2
Red
OFF
250
3
Green
OFF
–
4
Green
Green
250
5
Green
Red
250
6
Green
OFF
–
LED
Name
Indication
Operating Status
Remarks
Color
Status