6 opening and closing the sunny mini central, 1 opening the sunny mini central, 2 closing the sunny mini central – SMA SMC 5000 Installation User Manual
Page 35: Opening and closing the sunny mini central, Opening the sunny mini central, Closing the sunny mini central

SMA
Technologie AG
Opening and Closing the Sunny Mini Central
Installation Guide
SMC50_60-11:SE2006
Page 35
6 Opening and Closing the Sunny Mini Central
6.1 Opening the Sunny Mini Central
1.
Switch off the AC connection.
2.
Prevent accidental reconnection!
3.
Disconnect the PV generator from the Sunny Mini Central 5000/6000 by pulling
off all the connectors.
4.
Wait 30 minutes! (This is necessary to let the internal capacitors dis-
charge.)
5.
Remove the six screws on the lid and pull the lid slightly forward.
6.2 Closing the Sunny Mini Central
1.
Attach the lid to the enclosure of the Sunny Mini Central 5000/6000 by tighten-
ing the six screws. Don’t forget the lock washers. The notches of the lock washers
should face to the lid.
2.
Connect the PV generator.
3.
Switch on the AC circuit breaker. This activates the Sunny Mini Central 5000/
6000.
4.
Check whether the LEDs of the Sunny Mini Central 5000/6000 indicate trouble-
free operation.
If the inverter has to be openend always follow the safety instruc-
tions given in chapter 2 „Safety Instructions” (page 9).
Caution: Stick to the order specified below!
Caution: Stick to the order specified below!