SMA SC 200 Installation User Manual
Page 48

Internal Electrical Connections
SMA Solar Technology AG
48
SC20_25_35-IEN094521
Installation Guide
5.9.2 Connecting Team Cables for Sunny Central 200 / 250 with
the "Protection against Chemically Active Substances" Option
Team cabling must be implemented for the team leader and the team device.
Team cabling is pre-installed in the AC cabinet. The team cables are in the AC cabinet. The connection
terminals for team cabling are in the DC cabinet.
The following diagram shows the position of the connection terminals for team cabling in the
Sunny Central 250.
A
Team cable connection point
Position of the connection terminals for team cabling
The exact position of the connection terminals for team cabling can be determined with the
help of the equipment identifier and the circuit diagram enclosed.