SMA SC 200 Installation User Manual
SMA Equipment
This manual is related to the following products:
Table of contents
Document Outline
- 1 Notes on this Manual
- 2 Safety
- 3 Scope of Delivery
- 4 Installation
- 5 Internal Electrical Connections
- 5.1 Preparatory Work for the Sunny Central 200 / 250 with the "Protection against Chemically Active Substances" Option
- 5.2 Connecting the Power Cables
- 5.3 Connecting the PE Connection
- 5.4 Connecting the Control Lines on the Transfer Terminal Strip
- 5.5 Connecting the Sunny Central Control to the Power Unit
- 5.6 Connecting the Internal Control Lines
- 5.7 Connecting Insulation Monitoring (optional)
- 5.8 Installing the Internal Temperature Sensor
- 5.9 Sunny Central in Team Connection (optional)
- 5.10 Connecting the EVR Resistor (optional)
- 6 External Connections
- 6.1 Removing the Sliding Plates
- 6.2 Connecting the AC Grid
- 6.3 Connecting the External PE Connection (Sunny Central 250HE only)
- 6.4 Connecting the Internal AC Power Supply
- 6.5 Connecting the DC Cable
- 6.6 Connecting the Team Cable (optional)
- 6.7 Analog Inputs
- 6.8 Remote Deactivation Unit
- 6.9 Connecting the Communication
- 6.10 Connecting the Emergency Shut-off
- 6.11 Fitting the Sliding Plates
- 7 Commissioning
- 8 Technical Data
- 9 Contact