3 connecting the pe connection, 1 sunny central 200 / 250 / 250he and 350, Connecting the pe connection – SMA SC 200 Installation User Manual
Page 40: Sunny central 200 / 250 / 250he and 350

Internal Electrical Connections
SMA Solar Technology AG
40
SC20_25_35-IEN094521
Installation Guide
5.3 Connecting the PE Connection
5.3.1 Sunny Central 200 / 250 / 250HE and 350
The PE rails of the two switch cabinets must be connected to one another. They are in the lower area
of the side walls. The required cables are included. The following diagram shows the connection point
of the PE connection of the Sunny Central 250 as an example.
1. Connect the PE cables to the marked PE rails.
2. Ensure that the PE connection is correct and secure.
☑ The PE cable is connected.
Position of the PE rail
The exact position of the PE rail differs depending on the model. The exact position of the
PE rail can be determined with the help of the equipment identifier and the circuit diagram
enclosed.