Certified countries – SMA SB 1100 User Manual
Page 8
Security
SMA Solar Technology AG
8
SB11_12_17-IEN100132
Installation Guide
Certified Countries
The Sunny Boy 1100 / 1200 / 1700 (with according configuration) fulfill the requirements specified
in the following standards and directives (dated: July/2009):
• VDE 0126-1-1 (02.2006)
• G83/1 (09.2003)
• CER/06/190 (10.2006)
• E 2750 (11.2004)
• PPC (06.2006)
• EN 50438 (12.2007)
• C10/C11 (08.2003)
• AS4777 (2005)
• MEA
• IEC-utility Meeting 216
SMA Solar Technology can preset special grid parameters for other countries / installation locations
according to customer request, after evaluation by SMA Solar Technology.
You can later make modifications yourself by changing software parameters with respective
communication products (e.g. Sunny Data Control). A personal password is required for this, which
you can obtain from the Serviceline upon request.