Electrical Connection

Installation Guide

SB11_12_17-IEN100132

17

5.2 Connecting the Sunny Boy to the public grid (AC)

Cable Design

The conductor cross-section should be dimensioned in a way that output losses do not exceed 1% at
nominal power. Use "Sunny Design" (www.SMA.de/en/SunnyDesign) for this.
The maximum cable lengths relative to the conductor cross-section are shown in the following table.

The conductor cross-section required in individual cases depends on the following factors:

• ambient temperature,
• routing method,
• UV resistance,
• line losses,
• valid installation guidelines of the respective country (of the installation site).

Cable Requirements

Connection requirements of the grid operator
Comply with the connection requirements of your utility operator.

Conductor cross-section

Maximum cable length

SB 1100

SB 1200

SB 1700

1.5 mm²

21 m

18 m

15 m

2.5 mm²

35 m

30 m

22.5 m

Position

Designation

Value

A

External diameter

9 ...17 mm

B

Conductor cross-section

max. 2.5 mm²

C

Strip insulation

4 ... 5 mm