2 connecting the sunny boy to the public grid (ac), Connecting the sunny boy to the public grid (ac), C), section 5.2 – SMA SB 1100 User Manual
Page 17
SMA Solar Technology AG
Electrical Connection
Installation Guide
SB11_12_17-IEN100132
17
5.2 Connecting the Sunny Boy to the public grid (AC)
Cable Design
The conductor cross-section should be dimensioned in a way that output losses do not exceed 1% at
nominal power. Use "Sunny Design" (www.SMA.de/en/SunnyDesign) for this.
The maximum cable lengths relative to the conductor cross-section are shown in the following table.
The conductor cross-section required in individual cases depends on the following factors:
• ambient temperature,
• routing method,
• UV resistance,
• line losses,
• valid installation guidelines of the respective country (of the installation site).
Cable Requirements
Connection requirements of the grid operator
Comply with the connection requirements of your utility operator.
Conductor cross-section
Maximum cable length
SB 1100
SB 1200
SB 1700
1.5 mm²
21 m
18 m
15 m
2.5 mm²
35 m
30 m
22.5 m
Position
Designation
Value
A
External diameter
9 ...17 mm
B
Conductor cross-section
max. 2.5 mm²
C
Strip insulation
4 ... 5 mm