11 Decommissioning
Operating Manual
GRID-BOX-12-3-20-BE-en-10
31
11 Decommissioning
11.1 Disassembling the Grid Connect Box
2. Remove all fastening screws from the kick plates at the front and rear. Retain screws for later use. These screws will
be needed later to reattach the kick plates.
3. Disassemble protective cover and base plates.
4. Remove all cables from the Grid Connect Box.
5. Release and remove the fastening screws of the Grid Connect Box.
6. Mount the protective cover and base plates.
7. Close the doors of the Grid Connect Box.
9. Remount the kick plates on the Grid Connect Box.
11.2 Disposing of the Grid Connect Box
• Dispose of the Grid Connect Box in accordance with the locally applicable disposal regulations for electronic waste.
1.
'$1*(5
High voltages are present in the Grid Connect Box and the multicluster system. Touching live components results in
death or serious injury due to electric shock.
• Disconnect the Grid Connect Box and multicluster system (see Section 8, page 22).
8.
:$51,1*
Danger of crushing if the raised or suspended Grid Connect Box topples or falls
The Grid Connect Box can topple or fall if it is lifted and transported carelessly or hastily. This can result in death or
serious injury.
• Always transport the Grid Connect Box as close to the ground as possible.
• Use means of transportation which are adequate for the weight of the Grid Connect Box of 103 kg.
• Transport the Grid Connect Box in an upright position.
• Always maintain an adequate safety distance from the Grid Connect Box during transport.
• Note the center of gravity of the Grid Connect Box. The center of gravity of the Grid Connect Box is located