beautypg.com

3 preparing the mounting location, 4 transport, 1 transport options – SMA GRID CONNECT BOX 12 User Manual

Page 15: 3 preparing the mounting location 5.4 transport

background image

SMA Solar Technology AG

5  Installation

Operating Manual

GRID-BOX-12-3-20-BE-en-10

15

5.3 Preparing the Mounting Location

Dimensions of the drill holes for fixing the Grid Connect Box:

Figure 7: Outside base measurements and dimensions of the drill holes

Additionally required mounting material (not included in the scope of delivery):

☐ 4 suitable screw anchors to fasten the Grid Connect Box

Procedure:

1. On the mounting surface, mark the position of the four drill holes for attaching the base.
2. Drill holes at the marked positions.
3. Insert screw anchors.

5.4 Transport

5.4.1 Transport Options

The Grid Connect Box is delivered on a Euro pallet. You can use the following means of transport to lift the

Grid Connect Box off the Euro pallet:

• Forklift
• Crane with suitable fork

:$51,1*

Danger to life due to fire or explosion
Despite careful construction, electronic devices can cause fires if they are not installed properly. Contact with flammable

materials allows fire to spread. This can result in death or serious injury.

• Do not install the Grid Connect Box on flammable construction materials.
• Do not install the Grid Connect Box in areas containing flammable substances or objects.
• Do not install the Grid Connect Box in potentially explosive atmospheres.