Installation, Venting – Excalibur electronic P95-LP3 User Manual
Page 11

Excalibur
®
P95-3 Zero Clearance Direct Vent Gas Fireplace
11
VENTING
FPI Direct Vent System Flex Horizontal Terminations Only
These venting systems, in combination with the P95-3 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by
Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior
Vent Termination Locations" section.
FPI Direct Vent Flex System Termination
Kit (Part # 946-615) includes all the parts
needed to install the P95-3 with a maximum
run of 4 feet.
1) 8" dia. fl exible liner (4 ft. length)
2) 5" dia. fl exible liner (4 ft. length)
3) spring spacers (4)
4) thimble
(2)
5) AstroCap XL termination cap (1)
6) screws
(12)
7) tube of Mill Pac (1)
8) plated
screws
(8)
9) screws #8 x 1-1/2" Drill Point,
Stainless
Steel
(4)
10) vinyl siding standoff
If longer runs are needed, the FPI Direct Vent
system (Flex) kit is (Part # 946-616) which
includes all the parts needed to install the
P95-3 with a maximum 10' run.
1) 8" dia. fl exible liner (10 ft. length)
2) 5" dia. fl exible liner (10 ft. length)
3) spring spacers (7)
4) thimble
(2)
5) AstroCap XL termination cap (1)
6) screws
(12)
7) tube of Mill Pac (1)
8) plated
screws
(8)
9) screws #8 x 1-1/2" Drill Point,
Stainless
Steel
(4)
10) vinyl siding standoff
INSTALLATION
Notes:
1) Liner sections should be continuous
without any joints or seams.
2) Only Flex pipe purchased from FPI may
be used for Flex installations.
3) Horizontal vent must be supported every
3 feet.