ShoreLand'r SLB60TAL User Manual
Page 5

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorelandr.com
0004303
Page
5
of
13
2/15/2011
NOTE: The hook end of the springs must be
of the trailer - on both axles!
First Axle Installation:
installed in the same direction, to the rear
00lb trailers:
, hook the hook
the
or front axle 8200lb trailers:
first axle with the hole provided in the spring bracket. From
Raise the rear hook end of the spring and
3
” hex bolt through the hole in the rocker
bogie just below the spring leaf. Secure with a
9/16” lock nut.
xle Installation:
For rear axle 6000 & 70
Position the rear axle under the frame
loop of the spring around the bushings just installed.
Note that if the axle is positioned too low when trying to
hook, the hooks will not hook around the bushings.
Raise the front of the springs up so they align with
rear hole in the axle rocker bogie just installed. Secure
in place with 9/16” x 3-1/4” stainless steel hex bolts and
9/16” stainless steel lock nuts.
F
Align the eye of the spring on the
the outside in, insert a 9/16” x 3 3/4” hex bolt through the spring bracket and the eye of the
spring. Secure with a 9/16” hex lock nut.
axle assembly up so it is up inside the rocker
bogie. Secure in place by placing a 9/16” x
3/4
Second A
in the spring bracket
ith another 9/16” x 3-1/4” hex bolt
nd lock nut.
For front axle 6000 & 7200lb
trailers:
Hook the hook end of the springs
mounted to the front axle over the
bushing just installed in the rocker
arm assembly. Then swing the front
of the spring up and attach the front
mounting hole
w
a
Hook end of leaf
spring