Tool data 5.2 – HEIDENHAIN TNC 640 (34059x-05) User Manual
Page 191

Tool data
5.2
5
TNC 640 | User's Manual
HEIDENHAIN Conversational Programming | 1/2015
191
Column
Meaning
TNR
Tool number (
–1: No tool inserted yet)
IDX
Tool index
NAME
Tool name from the tool table
TIME
Tool-usage time in seconds (feed time
without rapid traverse movements)
WTIME
Tool-usage time in seconds (total usage
time between tool changes)
RAD
Tool radius R + Oversize of tool radius DR
from the tool table. (in mm)
BLOCK
Block number in which the
TOOL CALL
block was programmed
PATH
TOKEN = TOOL: Path name of the active
main program or subprogram
TOKEN = STOTAL: Path name of the
subprogram
T
Tool number with tool index
OVRMAX
Maximum feed rate override that occurred
during machining. During Test Run the TNC
enters the value 100 (%)
OVRMIN
Minimum feed rate override that occurred
during machining. During Test Run the TNC
enters the value –1
NAMEPROG
0: The tool number is programmed
1: The tool name is programmed
There are two ways to run a tool usage test for a pallet file:
The highlight in the pallet file is on a pallet entry: The TNC runs
the tool usage test for the entire pallet
The highlight in the pallet file is on a pallet entry: The TNC runs
the tool usage test for the entire pallet