beautypg.com

Open kayakdd-1 panel, Figure 35, Kayakdd-1 control panel – Grass Valley KayakDD-1 Installation User Manual

Page 81: Figure 36, Battery on the board of the control panel

background image

KayakDD-1 Digital Production Switcher


4. Push the battery forward

5. Close frame and fasten all screws.

7.4.9.2

Open KayakDD-1 Panel

1. Loosen the twelve screws around the panel (on every side three).

Figure 35

KayakDD-1 Control Panel


2. When all screws are loosened, lift the top of the panel carefully. The battery is

located in the middle of the base board

Figure 36

Battery on the Board of the Control Panel

80

Planning and Installation Manual