beautypg.com

Installation tasks – Grass Valley KayakDD-1 Installation User Manual

Page 35

background image

KayakDD-1 Digital Production Switcher

6.1.4 Installation

Tasks

After completing the Pre-Installation procedures, the recommended installation tasks
given in this section are:

1. Unpack the equipment,
2. Install the KayakDD-1 Video Processor frame,
3. Install the KayakDD-1 control panel,
4. Connect all cables between KayakDD devices,
5. Connect cables to video inputs and outputs, and
6. Connect the power cables.

Power up and configuration, including setting IP addresses, is covered in detail in the
next sections of this manual.


34

Planning and Installation Manual