Installation instructions. read me – Airaid 510-566 User Manual
Page 2

2
Installation Instructions. Read Me!
1. DISCONNECT NEGATIVE (-) BATTERY CABLE.
2. Remove air intake hose assembly.
3. Remove (2) nuts and studs for throttle linkage bracket. (Ref. “E”)
4. Remove throttle body cover bracket. (Ref. “C”)
5. Remove throttle body and install the power plate. (Ref. “D”)
6. Reinstall the throttle and throttle body cover brackets. (Ref. “C”, “E”)
7. Inspect & Test throttle linkage for full Open & Closed travel before driving. Some cruise or kickdown cables
may require adjustment. Please refer to your vehicles service manual for proper adjustment.
8. Reinstall air intake hose assembly.
9. Reconnect battery cable. Enjoy!
The sound of power...The “whistle” means its working!
Rev. 01/11/07
Ref. “E”- (2) 8mm Linkage Plates
(2) 8mm x 30mm Bolts
(2) 8mm x 12mm Bolts
Ref. “D”- (2) 8mm x 70mm Bolts
(2) 8mm x 100mm Bolts
(4) Washers
Ref. “B”- Throttle Body
Ref. “A”- (1) Power Plate
(3) “O” Rings
Ref. “C”- (1) 6mm Linkage Plate
(1) 6mm x 16mm Flat Head Screw
AIRAID Filter Co. 2688 E Rose Garden Ln. Phoenix AZ 85050 (800) 498-6951 [email protected] www.airaid.com