beautypg.com

625l tube loading – Watson-Marlow 624Di User Manual

Page 20

background image

Watson-Marlow Bredel E-Manuals

http://www.watson-marlow.it/pdfs-global/m-624Di-gb-01.htm[10/07/2012 13:59:15]

625L Tube loading

Double-Y element

Lift the track locating levers and remove the track. Locate one end of double-Y element

over one of the 625L clamping pegs. Stretch the element over the rotor and locate the

other end of the element over the second 625L clamping peg. Replace the track and push

down the track locating levers. (See pumphead installation).

Twin inlet tubes

Lift the track locating levers and remove the track. Twist and remove the 625L inlet

clamping peg. Connect the twin inlet tubes and outlet tube using the appropriate Y-piece

connector and clamps. Fit the inlet tubes into the correct size clamping block. Locate the

clamping block onto the 625L (push down and twist locking fastener to secure). Stretch the

tubes over the rotor and locate the Y-piece end of the element over the second 625L

clamping peg. Replace the track and push down the track locating levers.

Two independent tubes

Lift the track locating levers and remove the track. Twist and remove the 625L clamping

pegs. Fit the two tubes into the correct size clamping blocks. Distance between blocks =

230mm for up to 8.0mm bore; 240mm for 12.0mm and 16.0mm bore. Fit the inlet tube

clamping block to the 625L. Stretch the tubes over the rotor and fit second tube clamping

block to the 625L. Replace the track and push down the track locating levers. When using

Marprene it is important to check the distance between the clamping blocks after 30

minutes running time.