beautypg.com

620re, 620re4 and 620r pumphead spares – Watson-Marlow 624Di User Manual

Page 18

background image

Watson-Marlow Bredel E-Manuals

http://www.watson-marlow.it/pdfs-global/m-624Di-gb-01.htm[10/07/2012 13:59:15]

Ensure a 20 minute acclimatisation period is observed before running the pump

following SIP.

Ensure that controlled waste pipework is fitted to allow a safe release of steam in

the event of a tube failure..

Ensure a 1m safety zone is maintained around the pumphead during SIP cycles.

Ensure that the pumphead door is closed and locked before SIP

cleaning commences.

620RE, 620RE4 and 620R Pumphead spares

Number

Spare

Description

1

Tube clamp pack: p/n 069.4101.000

2

MR2052C

Oddie fastener

2

MR2053B

Clip: Oddie retainer

2

MR2054T

Oddie washer

2

SG0021

Oddie spring

2

CX0150

Oddie circlip (snap ring)

3

MRA0251A

Track assembly (continuous pumphead) - includes guard

3

MRA0297A

Track assembly (element pumphead) - includes guard