Seaward 100 PrimeTest User Manual
Page 14

PrimeTest 100
Operating Instructions
12
• The unit will proceed with the Insulation and
Leakage
tests.
Note:
The power switch on the appliance
under must be in the ON position to
perform an insulation test. If no
appliance is detected the PrimeTest
100 will display the following.
•
Check that the appliance power switch is in the
ON position. The test will automatically proceed
if the appliance power switch is placed in the
ON
position.
• If
the
LO LOAd enunciator remains on the
display, the load presented by the appliance
may be too small for the PrimeTest 100
to detect. In this case, press the test key
to
continue.
•
If the Insulation Resistance is greater than the
factory set limit a tick is placed next to the Riso
enunciator. If the Leakage current is less than
the factory set limit a tick is placed next to the
I
LEAK
enunciator.
• The
PASS enunciator is illuminated.
2
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)