Installation, Cb a – REMKO CMF-120-1P User Manual
Page 29
Notes for commissioning
The commissioning and
programming of the heat-
pump manager may be
carried out only by an
installer authorized by
REMKO.
NOTE
End
Installation
OK
■
System 1 is pre-installed at
the factory. After a reset of
the heat-pump manager, the
parameters for System 1 are
loaded.
■
An intensive visual inspection
is to be carried out before the
actual commissioning.
■
Switch on the electrical supply.
■
The following screen appears
on the Multitalent display.
■
Check which system schematic
is used (see the hydraulic
schematic in the heat-pump
manager handbook).
■
If the System 1 schematic is
applicable, you need only press
the F-button next to End .
Should a different system
schematic be selected, press
the F-button next to OK to
begin installation.
■
The configuration in the
installation level for the
selected hydraulics has to be
completely
programmed with
the parameters that go with
it (see the hydraulic schematic
in the heat-pump manager
handbook).
■
The system has to be matched
to the customer's personal
values (e.g. inlet temperature).
■
The brief instructions supplied
give an overview of how to set
the most important values.
■
After configuration, the
system is to be run-in and
the measured values are to be
recorded in the commissioning
report.
C
B
A
The heat pump manager is controlled
by means of the following buttons.
The rotary knob (A)
can be used to toggle
between the displayed
menu points or to change
the set values.
Pressing the Home
button (B) always returns
you to the standard
display.
Each of the four function
keys (C) stand for one
of the four rows on the
display. Pressing an F
button serves to select a
menu item or set value.
Home
The Multitalent heat pump
manager serves to operate and
control the entire plant.
The heat pump manager itself
is operated by the control unit.
The control console is connected
to the basic device and is located
behind the flap on the indoor
module.
Please review the heat-
pump manager manual for
important details about
successful commissioning.
NOTE
During commissioning,
only a typical heat-manager
pre-set is made. Individual
settings must be optimized
for construction materials and
the practices of various users.
Especially during the first
heating period.
NOTE
After a power failure etc.,the
previously programmed
configuration can be accepted
immediately by pressing the
F-button next to
End.
This also
happens automatically after a
delay of 10 minutes.
!
CAUTION
29