9 electrical wiring, 1 important information, 10 commissioning – REMKO WKF 120 Duo User Manual
Page 44: 1 control panel and information on commissioning, Electrical wiring 9.1 important information, Remko wkf duo, Electrical wiring, Commissioning

9
Electrical wiring
9.1
Important Information
CAUTION!
You can find information on the electrical connec-
tions of the indoor and outdoor unit, on the ter-
minal assignment of the I/0 module, as well as on
the circuit diagrams in the separate "Electrical
wiring" operating instructions
10
Commissioning
10.1
Control panel and
information on commissioning
The Smart Control is used to operate and control
the entire heating system. The Smart Control is
operated from the operating unit. The operating
unit is positioned on the basic device.
n
The unit is pre-installed at the factory. After a
reset of the Smart Control, the default parame-
ters are loaded.
n
An intensive visual inspection is to be carried
out before the actual commissioning.
n
Switch on the power supply.
n
Then the preinstalled data is loaded and the
parameters can be set with the help of the
commissioning wizard. You can find informa-
tion on this in the separate operating instruc-
tions of the Smart Control.
NOTICE!
Before commissioning the domestic water
storage will be filled.
REMKO WKF Duo
44