Connections

1 Outlet on the wall, right
2 Outlet through the wall, right
3 Outlet through the wall, right
4 Outlet on the wall, left

1

2

3

4

Connections
on the indoor unit

Both units are pre-filled with
refrigerant.
Suitable protective clothing
must be worn during
installation.

!

ATTENTION

Connection lines are filled with
refrigerant! Suitable protective
clothing must be worn during
installation.

!

ATTENTION

Unit installation

The indoor unit is attached by
means of a wall bracket, taking
into consideration the air discharge
side located in the lower part.

1. Mark the mounting points on

the structurally permissible
building sections according
to the dimensions of the wall
bracket.

2. If necessary, remove the break

out opening of the housing.

3. Connect the refrigerant pipes

to the indoor unit as described
below. The flexible refrigerant
pipe and the electrical control
cable are pre-installed.

4. Suspend the indoor unit on the

wall bracket by tilting it back
slightly and then by pressing
the bottom part of the unit
against the bracket (figure 5).

5. Check again that the unit is

level.

Wall bracket
for indoor unit

The wall bracket for the unit must
be attached with suitable screws
and anchors.

Installation

Installation should only be
performed by authorised
specialists.

NOTE

Oil return measures

If the outdoor component is
installed at a higher level than
the indoor unit, suitable oil return
measures must be taken. Usually,
an oil pump bend is installed
for every 2.5 metres of height
difference.

Connection of
refrigerant pipes

The refrigerant pipes should be
connected by the customer on the
right-hand side of the outdoor
component.

1. Use the wall or floor brackets to

fasten the outdoor component
where structurally allowed
(refer to the installation
instructions for the brackets).

2. Ensure that structure-borne

sound is not transferred to
the building. Use vibration
dampers to reduce the effects
of structure-borne sound!

3. Prepare the refrigerant pipes

for the outdoor component as
described above.

5 Connecting

Extending the
refrigerant pipes

The 2 m refrigerant pipe contained
in the delivery may be extended by
3 metres or 8 metres.

1. Remove the protective caps

from the quick connectors.

2. Connect the suitable pipes and

check their leak tightness after
connection.

19

Oil return measures

Outdoor component

Oil pump bend

in suction line

to outdoor

component one

every 2.5 metres of

height difference

Radius:

Min. 100 mm

Max. 2.5 m

Indoor unit