2 synthesizer cartridge – Nortec SynPur User Manual
Page 32
Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009
page 32 of 37
6.2 Synthesizer cartridge
bar
ba
r
ba
r
bar
1
1
3
2
4
IN
OUT
Patentierte
Reinraum-Befeuchtung
Prozessorgesteuerte
Demineralisierung
Automati sierte
Hygienefunktionen
Modem-
Schnittstelle
Ausbeute 100%
Anbindung
Gebäudetechni k
Ein/Aus
Produkt
Gas
Synthese-
wasser
Synthese-
patrone
Reinwasser
Figure 19: Replacing the synthesizer stage
-
Close the shutoff valves (1) on the mounting rail.
-
Turn off the mains switch (2) of the SynPur.
-
Open the shutoff valves (3). Wait until the system is completely depressurized.
The pressure is indicated on the pressure gage.
-
Remove the lines (4) on the synthesizer cartridge.
-
Connect the new synthesizer cartridge in reverse order.
ATTENTION: When exchanging the synthesizer cartridges, ensure that the inputs
and outputs are connected as described in Section 3.3.
ATTENTION: After the system has been restarted it should be checked for leak-
tightness. Inspect the system occasionally over the next two days.
The Operator should send the exchanged synthesizer cartridge to NORTEC for
regeneration: