beautypg.com

3 electrical installation, 1 synpur – Nortec SynPur User Manual

Page 21

background image

Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009

page 21 of 37

-

Fittings and hose should be inspected for leak-tightness.



4.3 Electrical installation


This document does not cover the installation of the voltage supply. However,
requirements for this are addressed. The installation of the electrical components
of the SynPur and the location of the voltage supply are shown.

ATTENTION: The design of the electrical installation, including the voltage supply,
must conform to local safety regulations and standards.

IMPORTANT
for the electrical installation:

-

The cable ends must have appropriate end splices.


-

Fuse protection should be provided in the specified values.

- The installation must be performed exclusively according to the diagrams
referenced in this document.

-

During the installation the voltage supply must be turned off and secured
against accidental activation.

4.3.1 SynPur

The voltage supply is created over a wall receptacle and the connecting cable
belonging to the delivery (equipped with a standard 3-pin plug with grounding
connections).

Figure 13: Electrical installation SynPur

Voltage supply SynPur 3400 : 230 V AC, 10%, single-phase
Voltage supply SynPur 3402 : 120 V AC, 10%, single-phase
Fuse protection

: 10A, time-lag

Conductors

: L1, N, PE

Cable cross section

: 1.5 mm² (AWG 16)

bar

Patentierte
Reinraum-Befeuchtung

Prozessorgesteuerte
Demineralisierung

Automatisierte
Hygienefunktionen

Modem-
Schnittstelle

Ausbeute 100%

Anbindung
Gebäudetechnik

Ein/Aus

Produkt

Gas

Synthese-

wasser

Synthese-

patrone

Reinwasser