3 electrical installation, 1 synpur – Nortec SynPur User Manual
Page 21
Created: 21.12.2006
Changed: 21.03.2007
Printed: 02.03.2009
page 21 of 37
-
Fittings and hose should be inspected for leak-tightness.
4.3 Electrical installation
This document does not cover the installation of the voltage supply. However,
requirements for this are addressed. The installation of the electrical components
of the SynPur and the location of the voltage supply are shown.
ATTENTION: The design of the electrical installation, including the voltage supply,
must conform to local safety regulations and standards.
IMPORTANT for the electrical installation:
-
The cable ends must have appropriate end splices.
-
Fuse protection should be provided in the specified values.
- The installation must be performed exclusively according to the diagrams
referenced in this document.
-
During the installation the voltage supply must be turned off and secured
against accidental activation.
4.3.1 SynPur
The voltage supply is created over a wall receptacle and the connecting cable
belonging to the delivery (equipped with a standard 3-pin plug with grounding
connections).
Figure 13: Electrical installation SynPur
Voltage supply SynPur 3400 : 230 V AC, 10%, single-phase
Voltage supply SynPur 3402 : 120 V AC, 10%, single-phase
Fuse protection
: 10A, time-lag
Conductors
: L1, N, PE
Cable cross section
: 1.5 mm² (AWG 16)
bar
Patentierte
Reinraum-Befeuchtung
Prozessorgesteuerte
Demineralisierung
Automatisierte
Hygienefunktionen
Modem-
Schnittstelle
Ausbeute 100%
Anbindung
Gebäudetechnik
Ein/Aus
Produkt
Gas
Synthese-
wasser
Synthese-
patrone
Reinwasser